FocusPod / Italy
Office pod installation and site access
Share the final location and the route into the building. We review the handling and installation scope for your actual site, not just its postcode.
Walk the route inside
Measure the loading area, doors, corridors, turns and goods lift as well as the final room. Record lift dimensions and load limits, stairs, access bookings and building-management requirements. Photos and a floor plan help us understand the site.
How your pod arrives
See how your pod arrives in sections and is assembled at your workplace.
Watch video11 secondsMake room around the pod
Review floor suitability and loading, door swing, assembly space, ventilation, servicing access and power. Product dimensions describe the pod itself, not every clearance around it. Have your facilities team review the intended position before approval.
Choose the right installation arrangement
Request installation with your project, or tell us if you plan to appoint your own contractor. Your written quote confirms the delivery address, receiving point, handling, assembly scope, access requirements, schedule and installation cost before you approve and pay.
Power and optional cooling
The final electrical specification is confirmed for your chosen model, equipment and destination. Check the proposed socket, supply and equipment requirements with your facilities team. Building electrical work needs an appropriately qualified professional.
Access and receiving arrangements
Provide the complete delivery address, postcode, floor and receiving contact. Include loading and unloading access, door widths, corridor turns, goods-lift dimensions and load limits, stairs and any access bookings or permits. The complete quote confirms the receiving point, internal handling and selected installation for the address.
Ready for the workday
Check the agreed furniture and extras, door operation, lighting, ventilation and controls with your installer. Retain the final specification and assembly information. Report missing items or anything that does not work as expected before completing the handover.
Fire safety & building requirements
Sprinkler and fire-alarm options are available. We help you confirm the details for your pod and workplace.
Can you include sprinklers and fire alarms?
Choose the optional sprinkler and fire-alarm package in the configurator. Your selection is recorded with your project. Equipment, connections to building systems, installation scope and price are confirmed in your complete quote before payment. Selecting this option does not by itself include a complete installed system.
What should I know about fire ratings?
Fire information is specific to the model and materials. A material fire classification does not establish a fire-resistance rating for the complete pod. Ask us to confirm the relevant test documentation for your chosen model and finishes.
An acoustic “Class A” rating describes sound reduction, not fire performance.
What should we check before ordering?
Start with your building manager: they may have requirements for introducing a pod into your workplace. Share those requirements and your installation address with us so we can confirm the appropriate equipment and connections with your building team. Local fire requirements still apply; the package is not a blanket requirement for every pod.
A space of your own
Let's make it yours.
Choose the pod. Shape the details.
We bring your approved configuration together.
Your complete project quote confirms the payable currency and price before payment.